Revenue & the room

Table Turns & Capacity Calculator

What is the ceiling on this room, and how close am I getting to it?

Before you spend on marketing, find out whether the room can even seat the guests you are trying to attract. Turn time is the whole cycle: seated, served, paid, cleared, reset.

Your figures stay here. The calculator runs on this device; the share link stores its numbers after the # in the URL.
Worked answer396See it ↓
01

Your numbers

A worked example is already loaded. Replace any field with the figures from the source named beside it.

Seats availableFloor plan
86

Seats in service for the period.

Service hoursYour schedule
6 hrs

How long you seat guests. Use the seating window, not total hours open.

Turn timeTime a few tables yourself
78 min

Full cycle from seating to the table being ready again, including clearing and reset.

Covers you actually did (optional)POS period report
248

Optional. Shows how much of the room's ceiling you are using.

Average check (optional)POS period report
$38.00

Optional. Converts spare capacity into the revenue it represents.

02

The answer

Theoretical cover capacity

396

4.62 turns per seat over 6 hours

  • Turns per seat4.62
  • Seats86
  • Service window6 hrs
  • Revenue at theoretical capacity$15,048
  • Capacity used62.6%
  • Unused theoretical capacity148
  • Revenue represented by unused capacityThe unused theoretical cover capacity valued at your average check. It is not guaranteed demand.$5,624
  • Turn time needed for 10% more coversMinutes per turn that would deliver 10% more covers in the same window.113.49
This is a whole-cover estimate under ideal timing, not a promised maximum. Party sizes, arrival bunching, table mix, and reset time all move the real result.
03 Show the arithmetic
Turns per seat = (service hours × 60) ÷ turn time in minutes
Theoretical cover capacity = seats × turns per seat, rounded down to a whole cover
Capacity used = actual covers ÷ theoretical cover capacity × 100
04 What the answer leaves out
  • Real utilisation well below 100% is normal and not a failure. Party size mismatch alone costs most rooms a meaningful share of their seats.
  • Cutting turn time raises the ceiling but can cut average check. Test both together before pushing service faster.
Continue if it helps

The number is the start of the decision.